Slider 01 Slider 02 Slider 03 Slider 04
This is an example of a HTML caption with a link.

Tariff

      D) PIT WELDING :

      For weld filling the pits as per Surveyor's instruction.


For removal/ fairing/ refitting as % of steel renewal.
125/-
For fairing in place as % of steel renewal.
100/-
For fitting of doublers as % of steel renewal.
95/-

     SCAFFOLDING/ STAGING FOR STEEL WORK :

1
Suspended staging
400/ meter
2
Built up staging.
10% Extra.
a.
Up to 7 meters from bottom
450/ sq. meter
b.
Up to 10 meters from bottom
650/ sq. meter
c.
Up to 15 meters from bottom
850/ sq. meter
d.
Up to 15 meters from bottom
1100/ sq. meter
NOTE :
1.Steel weight to be calculated from measurements At specific gravity of 8 kg/Sq. mtr./mm thickness plus 2% extra for wastage.
2.For less than 1 ton, rate in lump sum as per cost + profit will be charged.
3.For keel plates - 10% extra, for Peak tanks, Cofferdam, Engine room, Double bottom and Chain locker - 20% extra and for Internal steel work - 15% extra will be charged.
4.For special electrodes, actual cost difference will be charged extra.
5.For high tensile steel and Grade ' D' & ' E' steel, actual cost difference will be charged extra.

     PIPE WORKS:

    Remove pipe from place, fabricate new pipe using old flanges, and refit the pipe in place with new joints and old      fasteners.

N. B. (mm)
M S E.R.W
M S SCH 40
M S SCH 80
295
330
380
520
635
805
1065
1325
1610
2530
3050
4775
8910
10350
240
265
285
320
390
490
660
800
1060
1525
1925
3225
4600
5230
295
330
380
520
635
805
1065
1325
1610
2530
3050
4775
8910
10350
355
455
565
635
775
980
1410
1785
2245
3740
4485
7015
11325
15925
NOTE :
1.For galvanized ' C' class pipes, the above rates of M S E.R.W pipes to be increased by 15%.
2.For pipe renewal up to 1.0 mtr. the rate payable is to be for 1.0 mtr.
3.The above rates are for pipes on deck or in open space. For pipes below floor plates in engine room, pump room, tunnel room, in    congested or confined space the above rates are to be increased by 15%.
4.For removal and refitting of pipes without renewal, the rate payable will be 25% of renewal rates.
5.Hot galvanizing, staging and pressure testing are not considered.
6.For odd pipes, next higher sizes will be consider.
7.Arrangements for Explosive Inspector for Hot Work Clearance Certificate not included. This should be done at Owner's cost.
Note: The above tariff rates are tentative and subject to change depend of the management.